Ok I got the other 4Runner ready and will see ya all tomorrow morning.
Strawberry Fall Maintenance Run 1 of 2 - 9/28/25
Folsom4Rnr (Brian) Member Joined: April 2019Folsom4Rnr (Brian) Member Joined: April 2019// Brian //
Mike G Member Joined: October 2016Mike G Member Joined: October 2016Dang something came up and I'm unfortunately unable to make it tomorrow. See everyone on the next Sunday ANYTHING
Mike G
Folsom4Rnr (Brian) Member Joined: April 2019Folsom4Rnr (Brian) Member Joined: April 2019Off trail. Stopped for a quick appy and beverage at Solid Ground and now home and in packed.
Was a nice day out on trail.// Brian //
Gregulator Member Joined: February 2012Gregulator Member Joined: February 2012I got home around 4:30pm. Thank you Brian for your excellent leadership!!
Um...what?
Jeff L Member Joined: October 2023Jeff L Member Joined: October 2023Great trial run. Our trial looked pretty clean. Thanks for Brain and Brad for leading. Cookies and bread were delicious!! Thanks for the treats!
BKGM Jeepers President Joined: June 2003BKGM Jeepers President Joined: June 2003I got home at about 4:15 with some apple hill traffic.
A couple of trail observations:
Very little trash
Very little brush cut back - there were/are some overhanging branches that can be cut back.
There are lots of logs lining the trail, and many that narrow or slightly re-direct the trail. These need to be dealt with.
We did cut logs partially re-directing the trail on the back side of the trail.
Strawberry Canyon Rd needs some help!
We counted at least 3 culvert pipes that are completely clogged - resulting in creek flows across the road and erosion. These need to be dug up with shovels and pick axes. -
We cut down/removed a hanging snag tree on Strawberry Canyon Rd. Pay attention to your surroundings. Some are quite dangerous.
In speaking with our sub-group, I think we may need a committed saw-cutting effort to shorten logs so they can be physically moved.
Also, if Kris can get his mini excavator to Strawberry Canyon Rd. and clear the culverts before winter as a separate maintenance effort, or on the third run? This is not up the 4wd trail.
The kiosks need work. The strawberry side needs a need cross-support bracket brought up., and ensuring the roof is re-aligned. This is fairly simple.
The 88 side needs a ground brace to stabelize it, re-painting, and the roof realigned.
Both the hard signs need new decals for both the USFS and the club.
Does anyone see other improvements I missed?
Kathleen and Brad
BKGM Jeepers President Joined: June 2003BKGM Jeepers President Joined: June 2003Kathleen and Brad
Chris Campbell Member Joined: August 2019Chris Campbell Member Joined: August 2019With regards to Kris and the excavator work, if you do go up on a random weekday let me know. I typically have more weekdays free than weekends this time of year. I might be available for coming up for the day to help with some grunt work as your tractor does the big stuff.
Chris Campbell
BKGM Jeepers President Joined: June 2003BKGM Jeepers President Joined: June 2003Chris Campbell said With regards to Kris and the excavator work, if you do go up on a random weekday let me know. I typically have more weekdays free than weekends this time of year. I might be available for coming up for the day to help with some grunt work as your tractor does the big stuff.
With some notice I can help as well.
Kathleen and Brad
Folsom4Rnr (Brian) Member Joined: April 2019Folsom4Rnr (Brian) Member Joined: April 2019BKGM Jeepers said I got home at about 4:15 with some apple hill traffic. A couple of trail observations: Very little trash Very little brush cut back - there were/are some overhanging branches that can be cut back. There are lots of logs lining the trail, and many that narrow or slightly re-direct the trail. These need to be dealt with. We did cut logs partially re-directing the trail on the back side of the trail. Strawberry Canyon Rd needs some help! We counted at least 3 culvert pipes that are completely clogged - resulting in creek flows across the road and erosion. These need to be dug up with shovels and pick axes. - We cut down/removed a hanging snag tree on Strawberry Canyon Rd. Pay attention to your surroundings. Some are quite dangerous. In speaking with our sub-group, I think we may need a committed saw-cutting effort to shorten logs so they can be physically moved. Also, if Kris can get his mini excavator to Strawberry Canyon Rd. and clear the culverts before winter as a separate maintenance effort, or on the third run? This is not up the 4wd trail. The kiosks need work. The strawberry side needs a need cross-support bracket brought up., and ensuring the roof is re-aligned. This is fairly simple. The 88 side needs a ground brace to stabelize it, re-painting, and the roof realigned. Both the hard signs need new decals for both the USFS and the club. Does anyone see other improvements I missed?
We noted a few places it looks like people might be trying to create by passes and a few water spots we might want to keep an eye on. I sent Kris pictures with location info in metadata for our report out.
// Brian //
Folsom4Rnr (Brian) Member Joined: April 2019Folsom4Rnr (Brian) Member Joined: April 2019Some of the non-maintenance-business pix of the Posse... Was a great day with everyone. Thanks Stacey, Kelly and Jeff for the treats!






// Brian //
Sign in to post here.
