Skip to content

Strawberry Fall Maintenance Run 1 of 2 - 9/28/25

  1. Folsom4Rnr (Brian) Member Joined: April 2019
    #2627 Sep 2025, 1:20 PM

    Ok I got the other 4Runner ready and will see ya all tomorrow morning.

    // Brian //
  2. Mike G Member Joined: October 2016
    #2727 Sep 2025, 3:43 PM

    Dang something came up and I'm unfortunately unable to make it tomorrow. See everyone on the next Sunday ANYTHING

    Mike G
  3. Folsom4Rnr (Brian) Member Joined: April 2019
    #2828 Sep 2025, 11:41 AM

    Off trail. Stopped for a quick appy and beverage at Solid Ground and now home and in packed. 
    Was a nice day out on trail.

    // Brian //
  4. Gregulator Member Joined: February 2012
    #2928 Sep 2025, 11:00 PM

    I got home around 4:30pm. Thank you Brian for your excellent leadership!!

    Um...what?
  5. Jeff L Member Joined: October 2023
    #3029 Sep 2025, 6:12 AM

    Great trial run.  Our trial looked pretty clean.  Thanks for Brain and Brad for leading.  Cookies and bread were delicious!!  Thanks for the treats!

  6. BKGM Jeepers President Joined: June 2003
    #3129 Sep 2025, 7:25 AM

    I got home at about 4:15 with some apple hill traffic.

    A couple of trail observations:

    Very little trash

    Very little brush cut back - there were/are some overhanging branches that can be cut back.

    There are lots of logs lining the trail, and many that narrow or slightly re-direct the trail.  These need to be dealt with.

    We did cut logs partially re-directing the trail on the back side of the trail.

    Strawberry Canyon Rd needs some help!

    We counted at least 3 culvert pipes that are completely clogged - resulting in creek flows across the road and erosion.  These need to be dug up with shovels and pick axes. -

    We cut down/removed a hanging snag tree on Strawberry Canyon Rd.  Pay attention to your surroundings.  Some are quite dangerous.

    In speaking with our sub-group, I think we may need a committed saw-cutting effort to shorten logs so they can be physically moved.

    Also, if Kris can get his mini excavator to Strawberry Canyon Rd. and clear the culverts before winter as a separate maintenance effort, or on the third run?  This is not up the 4wd trail.

    The kiosks need work.  The strawberry side needs a need cross-support bracket brought up., and ensuring the roof is re-aligned.  This is fairly simple.

    The 88 side needs a ground brace to stabelize it, re-painting, and the roof realigned.

    Both the hard signs need new decals for both the USFS and the club.

    Does anyone see other improvements I missed?

    Kathleen and Brad
  7. BKGM Jeepers President Joined: June 2003
    #3230 Sep 2025, 4:30 AM

    Just a pic of the 88 side kiosk.

    88-Kiosk-E.jpg
    • 88-Kiosk-E.jpg
    Kathleen and Brad
  8. Chris Campbell Member Joined: August 2019
    #3330 Sep 2025, 3:51 PM

    With regards to Kris and the excavator work, if you do go up on a random weekday let me know.  I typically have more weekdays free than weekends this time of year.  I might be available for coming up for the day to help with some grunt work as your tractor does the big stuff.

    Chris Campbell
  9. BKGM Jeepers President Joined: June 2003
    #341 Oct 2025, 12:17 AM
    Chris Campbell said With regards to Kris and the excavator work, if you do go up on a random weekday let me know.  I typically have more weekdays free than weekends this time of year.  I might be available for coming up for the day to help with some grunt work as your tractor does the big stuff.   

    With some notice I can help as well.

    Kathleen and Brad
  10. Folsom4Rnr (Brian) Member Joined: April 2019
    #357 Oct 2025, 1:49 AM
    BKGM Jeepers said I got home at about 4:15 with some apple hill traffic.   A couple of trail observations: Very little trash Very little brush cut back - there were/are some overhanging branches that can be cut back. There are lots of logs lining the trail, and many that narrow or slightly re-direct the trail.  These need to be dealt with. We did cut logs partially re-directing the trail on the back side of the trail. Strawberry Canyon Rd needs some help! We counted at least 3 culvert pipes that are completely clogged - resulting in creek flows across the road and erosion.  These need to be dug up with shovels and pick axes. -  We cut down/removed a hanging snag tree on Strawberry Canyon Rd.  Pay attention to your surroundings.  Some are quite dangerous.   In speaking with our sub-group, I think we may need a committed saw-cutting effort to shorten logs so they can be physically moved. Also, if Kris can get his mini excavator to Strawberry Canyon Rd. and clear the culverts before winter as a separate maintenance effort, or on the third run?  This is not up the 4wd trail.   The kiosks need work.  The strawberry side needs a need cross-support bracket brought up., and ensuring the roof is re-aligned.  This is fairly simple. The 88 side needs a ground brace to stabelize it, re-painting, and the roof realigned. Both the hard signs need new decals for both the USFS and the club.   Does anyone see other improvements I missed?   

    We noted a few places it looks like people might be trying to create by passes and a few water spots we might want to keep an eye on. I sent Kris pictures with location info in metadata for our report out.

    // Brian //
  11. Folsom4Rnr (Brian) Member Joined: April 2019
    #367 Oct 2025, 2:01 AM

    Some of the non-maintenance-business pix of the Posse... Was a great day with everyone. Thanks Stacey, Kelly and Jeff for the treats!

    IMG_1039.jpgIMG_1038.jpgIMG_1047.jpgIMG_1055.jpgIMG_1056.jpgIMG_1064.jpgIMG_1067.jpg
    • IMG_1039.jpg
    • IMG_1038.jpg
    • IMG_1047.jpg
    • IMG_1055.jpg
    • IMG_1056.jpg
    • IMG_1064.jpg
    • IMG_1067.jpg
    // Brian //

Sign in to post here.