I saw this on the NorCal 4X4 FB page. This will have a major impact on the Fordyce trail for at least five years (gated from August 2019 through 2023). Those who break down on the trail will no longer be able to exit at the committee trail access point.
Important- Fordyce Dam Construction and Committee Trail temporary closure.
PG&E owns and operates Fordyce Dam and reservoir for water storage in association wi...th the overall Drum-Spaulding hydroelectric project.
This is notification of PG&E’s plan to perform major maintenance on Fordyce dam during the summer and fall of years of 2021-2023.
Preliminary investigation work is also taking place in summer/fall of this year, 2019.
In the interest of public safety and project security, the road into the dam will be gated and locked to prevent public access beginning in the latter half of the month of August, 2019.
The gate will remain locked for the construction season then left open during the winter months.
The initial gate location for years 2019 and 2020 will be on PG&E property south of the lake tender cabin.
As a result, the Committee trail will not be accessible from Fordyce Road when the gate is locked.
In years 2021-2023, the gate will be moved further south to near Fordyce Summit, pending approval from USFS.
The gates will be left in the open position during the annual Sierra Trek Event each year and PG&E will continue to manage flows in Fordyce Creek in support of the event.
PG&E owns and operates Fordyce Dam and reservoir for water storage in association wi...th the overall Drum-Spaulding hydroelectric project.
This is notification of PG&E’s plan to perform major maintenance on Fordyce dam during the summer and fall of years of 2021-2023.
Preliminary investigation work is also taking place in summer/fall of this year, 2019.
In the interest of public safety and project security, the road into the dam will be gated and locked to prevent public access beginning in the latter half of the month of August, 2019.
The gate will remain locked for the construction season then left open during the winter months.
The initial gate location for years 2019 and 2020 will be on PG&E property south of the lake tender cabin.
As a result, the Committee trail will not be accessible from Fordyce Road when the gate is locked.
In years 2021-2023, the gate will be moved further south to near Fordyce Summit, pending approval from USFS.
The gates will be left in the open position during the annual Sierra Trek Event each year and PG&E will continue to manage flows in Fordyce Creek in support of the event.
Public notice signage regarding the road closure will be posted in the field at several strategic locations, including the Fordyce Trailhead off Eagle Lakes road, Meadow Lake Campground and at Fordyce summit.
August 3, 2019
2:36 pm
2:36 pm
Gilbert & Betty
El Dorado Hills
Member
Club Member
Forum Posts: 1410
Member Since:
February 26, 2014
February 26, 2014
Offline
Forum Timezone: America/Los_Angeles
Most Users Ever Online: 81
Currently Online:
Guest(s) 1
Currently Browsing this Page:
1 Guest(s)
1 Guest(s)
Top Posters:
JohnDF: 9521
Fred: 3609
Gregulator: 3072
Jeff_R: 1801
RobD: 1721
Josh: 1630
Tom: 1465
Justin: 1416
Gilbert & Betty: 1410
Dan-H: 1378
Member Stats:
Guest Posters: 12
Members: 144
Moderators: 5
Admins: 1
Forum Stats:
Groups: 5
Forums: 24
Topics: 4294
Posts: 66484
Newest Members:
1989YJSarah, billyvincent26, chassidyoatley1, heykell, Julie Dwyer, [email protected], follosdin, TerryL, [email protected], Ski manModerators: Posse4x4: 1, BKGM Jeepers: 7064, Lynda and Guy: 226, kris_olof: 1135, Jamie (K6NUB): 781
Administrators: k-jeep: 2240
Members Birthdays
Today: None
Upcoming: huck271
© Simple:Press —