    COMMITTEE TRAIL RE-ROUTE WRAP UP WORK DAY





    When: October 25, 2008 9am.



    Where: Meet at Fordyce Lake.



    What: Transport rock from a local source less than 100 yards away and deposit in an area of seasonal water flow.



    Why: To harden the area so erosion is controlled.



    Duration: Estimating approximately 3 hrs.



    Resources needed:



    10 to 15 volunteers with gloves and strong backs. No trail exists to access the rock so we will just carry them from their present location to the new section of trail.



    Additional information:



    Water, sodas and snacks will be provided.



    An informal trail run to Meadow Lake will follow for any interested people, water flow permitting.



    If the water release is too high for the safe passage of the majority of rigs an alternate run to Signal Peak will be considered.



    Closing and renovation of the existing section of Committee trail to be replaced will be scheduled for next spring.





    Please respond here if you plan to attend this work day.



    Thanks,



    Jeff

    "Rainfly"

  2. JohnDF Member Joined: July 2003
    #217 Sep 2008, 2:58 PM

    100 yard rock carries 😲

    I used to wheel a lot. . .
  3. Guest former user
    #317 Sep 2008, 3:04 PM
    "JohnDF" wrote: 100 yard rock carries 😲

    touchdown! just be carefull you dont spike the rock on your foot john. 😉

  4. Guest former user
    #417 Sep 2008, 3:05 PM
    "JohnDF" wrote: 100 yard rock carries 😲



    <>

  5. JohnDF Member Joined: July 2003
    #518 Sep 2008, 11:27 AM

    We have a run scheduled for that same day(one of my favorites).



    I hope you guys get enough help with it. !00 yard rock carries might scare some people away 😂

    I used to wheel a lot. . .
  6. Guest former user
    #618 Sep 2008, 12:29 PM

    I understand.

Sign in to post here.