Sunday October 14th will be our second maintenance run of the year on Strawberry Pass Trail and the first maintenance run since the trail has re-opened. This is the trail the club sponsors. This is the Spring run was held on a Saturday in an attempt to accommodate peoples schedules. To maintain member status you must make 1 of the 2 maintenance runs. If anyone is unable to make this event and wasn't on the spring run or fall run last year please talk to me at the meeting or send me a PM. That said, this is about trail clearing and maintenance for the forest service. Our key goal for this run is bucking the trees the equipment knocked down repairing the trail and moving the rocks back into place.
Trip info:
Meeting place - Shell at Pollock Pines exit off Highway 50 at 8:30am. We will meet and after a quick drivers meeting, split into groups, and will head up to the trailhead about 9:00AM.
Things to bring:
-Gloves
-Loppers/hand saw
-Chainsaw (please only USFS certified operators, no exceptions) and safety gear (chaps, eye protection, ear protection)
-Tree Savers (to wrap around rocks)
-Crowbars/breaker bars to move rocks
-Water
-Lunch
-Door magnets
-Good attitude (this is pubic land closed by a lawsuit, our effort here is what reopened the trail and will keep other trails open)
Please post if you will be attending. A rig is not necessary to attend as there are plenty of open seats. Just post up if you will need a ride and I will make sure you have a seat before we leave the parking lot. If this is your first trail run with the club then please review the vehicle requirements. Expect more details at the drivers meeting.
